#424 - All in Before the Win: Hidden Effort behind Design Build
Failed to add items
Add to basket failed.
Add to wishlist failed.
Remove from wishlist failed.
Adding to library failed
Follow podcast failed
Unfollow podcast failed
-
Narrated by:
-
By:
Summary
In this episode of the Construction Corner Podcast, host Dillon pulls back the curtain on what really happens inside an engineering firm when chasing a major project. He shares the story of a grueling two-to-three week sprint to put together a full set of 200 drawings — mechanical and electrical — for a mega project bid, with late nights, early mornings, and a team of nearly a dozen people working in parallel.
Dillon breaks down the "black box" of engineering: clients see polished deliverables, but never the grind behind them. He explains why showing up to a client presentation with a complete, coordinated drawing set is a powerful differentiator — and why sometimes you have to invest heavily before you even know if you'll win the job.
A must-listen for contractors, engineers, and design-build professionals who want to understand what it takes to compete for — and win — large-scale projects.